Skip to content
DirtWise

01 Free tool

Land Budget Worksheet

The listing price is the first price tag. Making the land livable is the second, and it has more lines than most buyers expect: survey and title, clearing and fill, a driveway and culvert, a well, septic and power, permits and impact fees, and the taxes you pay while you wait to build. Answer what you know; the total updates as you go.

01 The land

02 Site work

Clearing
Fill and grading

Low lots and flood zones often need fill so the floor sits above the base flood elevation.

What the parcel has

Not sure? Every DirtWise parcel shows its flood zone and wetlands in the Ledger.

03 Access

Driveway

04 Water, septic and power

Water

Neighboring wells in Marion run 95 to 140 ft.

Wastewater

Inside a springs protection area every new septic system must be nitrogen-reducing.

Power

05 Paying for it

How you buy

06 The homeoptional

What you will build

DirtWise

Land budget worksheet

Marion County

Itemized costs by stage
Buying the land
The land itselfYour price$45,000
Boundary surveyDirtWise 2026 planning range, not a bid$800 to $2,500
Owner's title insuranceFlorida promulgated rate, Rule 69O-186.003, F.A.C.$259
Closing, settlement and recordingDirtWise 2026 planning range, not a bid. Deed stamps (s. 201.02, F.S.) are customarily paid by the seller.$500 to $1,200
Site work
Clearing: mulch a half-acre homesite and driveDirtWise 2026 planning range, not a bid$1,800 to $3,500
Access
Gravel driveway, up to 200 ftDirtWise 2026 planning range, not a bid$2,000 to $6,000
Culvert and county right-of-way permitDirtWise 2026 planning range, not a bid$1,500 to $4,500
Water, septic and power
Well, pump and pressure tankDirtWise 2026 planning range, not a bid. Neighboring wells in Marion run 95 to 140 ft, from our parcel Ledgers.$5,500 to $9,500
Septic system, conventionalDirtWise 2026 planning range, not a bid$7,000 to $12,000
Power extension, under 300 ftDirtWise 2026 planning range, not a bid$1,200 to $3,500
Permits and fees
Septic permit and site evaluation (FDEP)DirtWise 2026 planning range, not a bid. FDEP has permitted septic systems since July 1, 2021.$600 to $1,500
Well construction permitDirtWise 2026 planning range, not a bid. Issued by the water management district.$100 to $500
Building permit and plan reviewDirtWise 2026 planning range, not a bid$1,500 to $5,000
Impact feesMarion County education impact fee, effective 2024-07-01. Other components not included.$4,307
Contingency
10 to 15% on site work, access and utilitiesRock, soil and weather move these lines more than any other$1,900 to $5,850
Land and site work, before the house$73,966 to $105,116
Every year until you build
Property taxes on vacant landDirtWise 2026 planning range, not a bid: 1% to 2% of the price. Check the county millage and the assessed value.$450 to $900/yr

Planning ranges, not bids. Soil, access, rock and season move every line. Lines marked with a statute or fee schedule are computed from it; the rest are 2026 quote ranges from our coverage counties. The pros directory gives written quotes.

FP Read before you trust any total

What no worksheet can price

  1. Limestone under the sand

    Much of north central Florida sits on karst. Rock raises well drilling and septic excavation costs, and a site evaluation is the only way to know.

  2. Title problems on old lots

    Gaps in the chain of title on decades-old subdivision lots can need a quiet title action before anyone will insure the sale.

  3. A road that exists only on the plat

    If the platted road was never built, you may be paying to build it, or you may not get a building permit at all.

  4. Utility deposits and hookups

    Electric co-ops and water utilities can ask for deposits and membership fees on top of the extension cost.

  5. Hurricane season

    Crews, materials and inspections slow down after a storm, and a stalled build keeps your holding costs running.

  6. Insurance once the house is up

    Homeowner and flood insurance in Florida depend on the roof, the elevation and the flood zone. Get quotes before you design.